Thought I could swap a 2 inch tube in an hour, took me a full shift and a half
Had to cut out a rolled tube on the back side of the boiler at the plant in Gary and the whole thing fought me the entire way, ended up being 11 hours before I got a clean fit. Any of you got a trick for getting to those back row tubes without pulling half the wall apart?