Vent: a foreman in Red Deer made us redo a whole footing pour and I'm still split on if he was right
So we're pouring footings on a small commercial job off Gasoline Alley and the foreman stops us halfway through. Says the mix was sitting too long in the truck before we got it down. Made us pull it and start fresh. Cost us about 4 hours and I don't even want to add up the concrete. Half our crew thinks he was just covering himself, other half says he saved us from a callback in 5 years. Where do you guys draw the line on a foreman calling a stop like that?