Question about that liner job in Lowell where my smoke test failed on the second floor
I was up on a roof in Lowell two weeks ago doing a liner on a 1920s colonial and my smoke test showed puffing at the second floor thimble joint after I had already sealed it twice. Everyone on the crew says just skim it with furnace cement and move on, but I pulled the whole section and found a 3/8 inch gap where the clay tile had shifted, so I re-piped it with a stainless T and lost half a day. Any of you had a thimble joint that looked tight but was leaking behind the tile, and how do you check it without tearing the wall apart?
Man, I feel for you on losing that half day. That gut feeling when the crew says just skim it and you know something is off is worth listening to. Pulling that section probably saved you a callback in January when the heat is cranking and that gap opens up worse. A 3/8 inch shift behind the tile is the kind of thing furnace cement will never fix, it just hides it for a season. Good on you for doing it right even when it cost you time.