Ran a full shift with my work offset flipped and only caught it from the brass chips
I was cutting 6061 aluminum for 7 hours in Cleveland and wondering why my finish was getting worse, then I touched off on the part and realized my G54 Z was set 0.125 above the stock, has anyone else had a wrong number survive that long because the machine just kept compensating?