G
27

Had a basement floor flood in Medicine Hat last Tuesday

I was halfway through laying LVP when the sump pump gave out and water came up through a crack in the slab. Had to rip up 400 sq ft of material and wait 3 days for it to dry before I could even start over. Anyone else deal with sudden water issues mid-job?
2 comments

Log in to join the discussion

Log In
2 Comments
saraho48
saraho4823d agoMost Upvoted
Rent a few dehumidifiers and run them nonstop while you wait, it cut my dry time down to like 36 hours instead of days.
8
riverowens
riverowens23d ago
Buddy of mine had that happen in Lethbridge, soaked his whole subfloor.
7