Hot take: too many guys are setting up outriggers on the mats and calling it done
I've been running a 50 ton Grove out of a yard in Bakersfield for about four years now, and the thing I keep seeing on job sites is operators dropping the floats right on the timber mats without ever checking what's under them. Last month I watched a guy set up over what turned out to be a filled trench from an old utility line, and you could see one corner start to sink a half inch before he even boomed up. The mats spread the load fine, but they don't fix bad ground, and the load chart assumes you know the soil you're sitting on. I always walk the spots first, poke around with a bar, and if something feels soft I move the whole rig over a few feet rather than argue about it. It's ten extra minutes that saves you a headache or worse. How many of you actually probe the ground before setup, or is it just me being picky?