Switched from manual boom leveling to hydraulic on a Grove RT540E last Tuesday
Used to spend 15 minutes per lift fidgeting with levers to get the boom flat, but the hydraulic system on this rental just smooths it out in seconds. Has anyone else made the jump and found it speeds up their pick cycles by a noticeable margin?