Why does nobody talk about checking the ladder wire tension on your swing ladder before a long pump setup?
Ran a 1,200 foot setup on a lake job near Bemidji last month and the ladder started hopping at the cutter head around hour three because I'd been running the winch wire loose by a good 4 inches, so now I tension it to spec with a come-along before every move, but I'm curious if anyone else has a number they swear by or just eyeball it like I used to.