Had 3 rooms of cheap apartment carpet come up in one day because the last guy stapled the pad to the tackless
Pulled into a 12 unit turnover over on Ellis Ave last Thursday. First two rooms came up normal. Third one I hit something hard under the pad and the pry bar just bounced. Turns out the guy before me ran staples right through the pad into the tack strip every 8 inches, so the whole thing was glued down by steel. Took me and my helper 2 extra hours just on 3 rooms and I had to eat the time because the bid was flat rate. Boss said he's seen it before from a crew that got cheap labor. Anyone got a faster way to rip that up besides a flat bar and a lot of swearing?
Heard a flooring guy on a podcast say a long-handled floor scraper with a sharp blade beats a flat bar for staples, you get way more leverage standing up. Worth trying before your back pays for it.