G
18

TIL our scrap rate dropped from 8% to under 2% in three months after we started using a simple pre-op checklist.

We just added a quick 5-point check for tool offsets, coolant levels, and program zero before every run, and it basically stopped those dumb first-part mistakes, so has anyone else tried something like this?
2 comments

Log in to join the discussion

Log In
2 Comments
jessicad98
jessicad9812h ago
You said it stopped dumb first-part mistakes. What were the most common ones you caught?
6
patkelly
patkelly13h ago
I mean that's a great result, but I wouldn't call that a pre-op checklist. That's just a standard setup procedure. A pre-op is more for safety stuff before you even power the machine on.
3